next up previous contents index
Next: Tracking Programs Up: Computer and Tracking Program Previous: System Shutdown

Tracking Program Startup Checklist

In general, it is a good idea to check the following information at the VT100 screen whenever you startup the tracking programs and begin to track an object.

  1. Is the UT displayed on screen 1 in agreement with the station clock (to an accuracy of 1 or 2 seconds)?

  2. Is the UT date correct?

  3. Is the UT1-UTC correction correct? (See DUT on screen 5 for current value)

  4. Are all sensors in their desired states? (See screen 6 and screen 2 for current sensor status.)

  5. Are the pointing offsets displayed on SCREEN 1 WINDOW 0 correct?

  6. Is the subreflector commanded to the correct position? (Use the command SUBREFLECTOR to check values)